Monday, August 5, 2013

Update 8/5

Updated Construction Progress tab with pictures (scroll to bottom for recent images)

A lot of workers at the house today!

Our cabinet is finally in place in the bonus bath (still needs the vanity & hardware). 

They replaced the broken cabinet door in the kitchen.

They installed some of the can lights in the kitchen.

They installed 6 of the fans (one is wrong - they installed a "Joy" where it was supposed to be a Kensington in the Living Room).


They put up the glass surrounds in the Master Bath shower and the Bonus Bath shower as well as all of the towel bars and tp holders They also installed the faucets and toilets.


They installed the wire shelving in all of the closets and the kitchen pantry.

They installed the dishwasher and the kitchen faucet.


They started to frame up the deck.


They started to do the exterior trim and boy does it make a HUGE difference on how much we like he house.

Still lots to do but it was really nice to see them taking advantage of the dry weather and getting some things done.

2 comments:

  1. Did you choose the nickel sink faucet vs the orb? I see you have orb shower surround. I didn't want it to be missed if you were expecting it. I really like the trim on the house, your lot is awesome with all those trees.

    ReplyDelete
  2. Thanks, we didnt have a choice on the kitchen faucet unfortunately.

    ReplyDelete